Our 6-Step ODM Process for Designing Children's Tableware
Our 6-step ODM process for designing children's tableware: design files, timeline per step, sample-stage support and quality control in each phase for B2B baby tableware buyers.

Designing new children's tableware from scratch can feel overwhelming. Our 6-step ODM process covers everything from concept to mass production, giving your brand a clear timeline, design support and built-in quality control at each stage — and a typical project takes 6–10 weeks from concept to pilot sample.
To start an ODM project you need a 2D sketch, a sample photo or a CAD file; we also accept hand drawings or mood boards. Hand-drawn sketches with dimensions, mood boards, reference samples sent by courier, and 2D or 3D files (STEP, IGES, DWG or AI) all work — CAD files speed up mold and DFM evaluation, while having no file at all is possible but makes the process longer.
Each step has its own timing: idea collection 3–5 days, drawing 5–7 days, quotation 2–3 days, sample making 10–14 days, revisions 7–10 days, and pilot testing 7–14 days. Simpler plastic items such as baby bowls or spoons can be faster; multi-part items with lids or suction bases take longer. During the sample stage we support material confirmation, printing previews, suction, lid and leak tests, tolerance reports and short video reviews, with 1–2 rounds of revisions before final tooling.
Quality control runs through every phase: drawing review for dimensions and wall thickness, quotation checks against the compliance list, prototype fit and function tests, video and photo checklists at revision, mold flow and flashing checks at pilot testing, and a full AQL inspection plus drop test before shipment. We use our standard B2B QC checklist — or your format if provided — and recommend a mini production batch for complex parts such as suction bases or tight-fitting lids.
